Some systems are experiencing issues

About This Site

This is the AirOn360 IoT Suite status page. Here you can check the current status of our systems in real time, as well as a list of all past incidents. You can also check this page to see if there are any planned or unplanned network outages in real time.

Past Incidents

Tuesday 17th March 2026

No incidents reported

Monday 16th March 2026

AirOn360 IoT Suite 23032026 AWS IoT Suite - Planned Maintenance Notification - RESCHEDULED-airon360 iot suite

Description: Dear Customer,

As part of G+D’s continuous improvement, we would like to inform you that a maintenance activity will take place on the AWS IoT Suite as well as the eIM PROD Environments on March 23rd, 2026.

Start Time: 2026-03-23 09:00:00 CET

End Time: 2026-03-23 14:00:00 CET

During this window, our AWS Cloud Team will perform updates to several AWS services.

This is a planned standard change of medium type, triggered internally by the G+D AWS Cloud Team. Please note that application downtimes are expected during the maintenance window. A rollback to the previous version will be available if needed.

All applications will be validated by the AWS Cloud Team and IoT Suite Team after the maintenance. Although no mandatory actions are required from your side, we recommend running additional testing and reporting any unusual behavior you may observe.

Thank you for your understanding and cooperation.

Kind regards,

IoT Customer Support Team

Services Affected: AWS

Location: GLOBAL

Start time: 2026-03-23 09:00:00 UTC+01:00

End time: 2026-03-23 14:00:00 UTC+01:00

Duration: 0d 6h 0m

Status: SCHEDULED

ROTN SIMs Connectivity 25032026 ROTN Maintenance Notification-rotn sims connectivity

Description: This is to inform you of a planned maintenance activity in one of the ROTN data centers scheduled for March 25. During this time, traffic will be switched between the primary and secondary sites, and brief connectivity interruptions may occur. Affected devices will automatically reconnect once the switchover is completed. The switchovers are scheduled to take place between 21:00–22:00 UTC and 00:00–01:00 UTC.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-25 20:00:00 UTC

End time: 2026-03-26 05:00:00 UTC

Duration: 0d 9h 0m

Status: SCHEDULED

Sunday 15th March 2026

No incidents reported

Saturday 14th March 2026

No incidents reported

Friday 13th March 2026

No incidents reported

Thursday 12th March 2026

No incidents reported

Wednesday 11th March 2026

No incidents reported

Tuesday 10th March 2026

ROTAM SIMs Connectivity 28032026 Planned Maintenance Notification - NEW-rotam sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 28. See details below:

Maintenance Window:

Start Date/Time: 28-Mar-2026 04:00 (GMT) | 27-Mar-2026 22:00 (Mountain)

End Date/Time: 28-Mar-2026 20:00 (GMT) | 28-Mar-2026 14:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner will implement planned maintenance to rebuild splice case as ongoing network hardening efforts.

Thank you for your undestanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-28 04:00:00 UTC

End time: 2026-03-28 20:00:00 UTC

Duration: 0d 16h 0m

Status: SCHEDULED

NAVZ SIMs Connectivity 28032026 Planned Maintenance Notification - NEW-navz sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 28. See details below:

Maintenance Window:

Start Date/Time: 28-Mar-2026 04:00 (GMT) | 27-Mar-2026 22:00 (Mountain)

End Date/Time: 28-Mar-2026 20:00 (GMT) | 28-Mar-2026 14:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner will implement planned maintenance to rebuild splice case as ongoing network hardening efforts.

Thank you for your undestanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-28 04:00:00 UTC

End time: 2026-03-28 20:00:00 UTC

Duration: 0d 16h 0m

Status: SCHEDULED

NATM SIMs Connectivity 28032026 Planned Maintenance Notification - NEW-natm sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 28. See details below:

Maintenance Window:

Start Date/Time: 28-Mar-2026 04:00 (GMT) | 27-Mar-2026 22:00 (Mountain)

End Date/Time: 28-Mar-2026 20:00 (GMT) | 28-Mar-2026 14:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner will implement planned maintenance to rebuild splice case as ongoing network hardening efforts.

Thank you for your undestanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-28 04:00:00 UTC

End time: 2026-03-28 20:00:00 UTC

Duration: 0d 16h 0m

Status: SCHEDULED

UKAT SIMs Connectivity 28032026 Planned Maintenance Notification - NEW-ukat sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 28. See details below:

Maintenance Window:

Start Date/Time: 28-Mar-2026 04:00 (GMT) | 27-Mar-2026 22:00 (Mountain)

End Date/Time: 28-Mar-2026 20:00 (GMT) | 28-Mar-2026 14:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner will implement planned maintenance to rebuild splice case as ongoing network hardening efforts.

Thank you for your undestanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-28 04:00:00 UTC

End time: 2026-03-28 20:00:00 UTC

Duration: 0d 16h 0m

Status: SCHEDULED

NAUS SIMs Connectivity 28032026 Planned Maintenance Notification - NEW-naus sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 28. See details below:

Maintenance Window:

Start Date/Time: 28-Mar-2026 04:00 (GMT) | 27-Mar-2026 22:00 (Mountain)

End Date/Time: 28-Mar-2026 20:00 (GMT) | 28-Mar-2026 14:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner will implement planned maintenance to rebuild splice case as ongoing network hardening efforts.

Thank you for your undestanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-28 04:00:00 UTC

End time: 2026-03-28 20:00:00 UTC

Duration: 0d 16h 0m

Status: SCHEDULED

NAUS SIMs Connectivity 26032026 Planned Maintenance Notification - NEW-naus sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 26. See details below:

Maintenance Window:

Start Date/Time: 26-Mar-2026 06:01 (GMT) | 26-Mar-2026 00:01 (Mountain)

End Date/Time: 26-Mar-2026 11:00 (GMT) | 26-Mar-2026 05:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner needs to replace degraded fiber jumper to ensure network integrity.

Thank you for the understanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-26 06:01:00 UTC-00:00

End time: 2026-03-26 11:00:00 UTC-00:00

Duration: 0d 4h 59m

Status: SCHEDULED

ROTAM SIMs Connectivity 26032026 Planned Maintenance Notification - NEW-rotam sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 26. See details below:

Maintenance Window:

Start Date/Time: 26-Mar-2026 06:01 (GMT) | 26-Mar-2026 00:01 (Mountain)

End Date/Time: 26-Mar-2026 11:00 (GMT) | 26-Mar-2026 05:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner needs to replace degraded fiber jumper to ensure network integrity.

Thank you for the understanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-26 06:01:00 UTC-00:00

End time: 2026-03-26 11:00:00 UTC-00:00

Duration: 0d 4h 59m

Status: SCHEDULED

NATM SIMs Connectivity 26032026 Planned Maintenance Notification - NEW-natm sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 26. See details below:

Maintenance Window:

Start Date/Time: 26-Mar-2026 06:01 (GMT) | 26-Mar-2026 00:01 (Mountain)

End Date/Time: 26-Mar-2026 11:00 (GMT) | 26-Mar-2026 05:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner needs to replace degraded fiber jumper to ensure network integrity.

Thank you for the understanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-26 06:01:00 UTC-00:00

End time: 2026-03-26 11:00:00 UTC-00:00

Duration: 0d 4h 59m

Status: SCHEDULED

NAVZ SIMs Connectivity 26032026 Planned Maintenance Notification - NEW-navz sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 26. See details below:

Maintenance Window:

Start Date/Time: 26-Mar-2026 06:01 (GMT) | 26-Mar-2026 00:01 (Mountain)

End Date/Time: 26-Mar-2026 11:00 (GMT) | 26-Mar-2026 05:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner needs to replace degraded fiber jumper to ensure network integrity.

Thank you for the understanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-26 06:01:00 UTC-00:00

End time: 2026-03-26 11:00:00 UTC-00:00

Duration: 0d 4h 59m

Status: SCHEDULED

UKAT SIMs Connectivity 26032026 Planned Maintenance Notification - NEW-ukat sims connectivity

Description: Dear Customer,

This is to notify you about a planned maintenance taking plance on March 26. See details below:

Maintenance Window:

Start Date/Time: 26-Mar-2026 06:01 (GMT) | 26-Mar-2026 00:01 (Mountain)

End Date/Time: 26-Mar-2026 11:00 (GMT) | 26-Mar-2026 05:00 (Mountain)

Impact : Resilience will be lost and service will be at risk. US Cellular Diameter will be impacted.

Short description what to being done Our transport partner needs to replace degraded fiber jumper to ensure network integrity.

Thank you for the understanding,

Kind Regards.

Services Affected: Data Services

Location: GLOBAL

Start time: 2026-03-26 06:01:00 UTC-00:00

End time: 2026-03-26 11:00:00 UTC-00:00

Duration: 0d 4h 59m

Status: SCHEDULED

Monday 9th March 2026

AirOn360 IoT Suite 16032026 AWS IoT Suite - Planned Maintenance Notification - NEW-airon360 iot suite

Description:Dear Customer,

As part of G+D’s continuous improvement, we would like to inform you that a maintenance activity will take place on the AWS IoT Suite as well as the eIM PROD Environments on March 16, 2026.

Start Time: 2026-03-16 09:00:00 CET

End Time: 2026-03-16 14:00:00 CET

During this window, our AWS Cloud Team will perform updates to several AWS services.

This is a planned standard change of medium type, triggered internally by the G+D AWS Cloud Team. Please note that application downtimes are expected during the maintenance window. A rollback to the previous version will be available if needed.

All applications will be validated by the AWS Cloud Team and IoT Suite Team after the maintenance. Although no mandatory actions are required from your side, we recommend running additional testing and reporting any unusual behavior you may observe.

Thank you for your understanding and cooperation.

Kind regards,

IoT Customer Support Team

Services Affected: AWS

Location: GLOBAL

Start time: 2026-03-16 09:00:00 UTC+01:00

End time: 2026-03-16 14:00:00 UTC+01:00

Duration: 0d 5h 0m

Status: SCHEDULED

  • Description:Dear Customer,

    As part of G+D’s continuous improvement, we would like to inform you that a maintenance activity will take place on the AWS IoT Suite as well as the eIM PROD Environments on March 16, 2026.

    Start Time: 2026-03-16 09:00:00 CET

    End Time: 2026-03-16 14:00:00 CET

    During this window, our AWS Cloud Team will perform updates to several AWS services.

    This is a planned standard change of medium type, triggered internally by the G+D AWS Cloud Team. Please note that application downtimes are expected during the maintenance window. A rollback to the previous version will be available if needed.

    All applications will be validated by the AWS Cloud Team and IoT Suite Team after the maintenance. Although no mandatory actions are required from your side, we recommend running additional testing and reporting any unusual behavior you may observe.

    Thank you for your understanding and cooperation.

    Kind regards,

    IoT Customer Support Team

    Services Affected: AWS

    Location: GLOBAL

    Start time: 2026-03-16 09:00:00 UTC+01:00

    End time: 2026-03-16 14:00:00 UTC+01:00

    Duration: 0d 5h 0m

    Status: RESOLVED

  • Description:Dear Customer,

    As part of G+D’s continuous improvement, we would like to inform you that a maintenance activity will take place on the AWS IoT Suite as well as the eIM PROD Environments on March 16, 2026.

    Start Time: 2026-03-16 09:00:00 CET

    End Time: 2026-03-16 14:00:00 CET

    During this window, our AWS Cloud Team will perform updates to several AWS services.

    This is a planned standard change of medium type, triggered internally by the G+D AWS Cloud Team. Please note that application downtimes are expected during the maintenance window. A rollback to the previous version will be available if needed.

    All applications will be validated by the AWS Cloud Team and IoT Suite Team after the maintenance. Although no mandatory actions are required from your side, we recommend running additional testing and reporting any unusual behavior you may observe.

    Thank you for your understanding and cooperation.

    Kind regards,

    IoT Customer Support Team

    Services Affected: AWS

    Location: GLOBAL

    Start time: 2026-03-16 09:00:00 UTC+01:00

    End time: 2026-03-16 14:00:00 UTC+01:00

    Duration: 0d 5h 0m

    Status: NEW

  • Sunday 8th March 2026

    No incidents reported

    Saturday 7th March 2026

    No incidents reported

    Friday 6th March 2026

    ROPDB SIMs Connectivity 18032026 Planned Maintenance Notification - NEW-ropdb sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 18. Please see the details below:

    Maintenance Window:

    Primary Window:

    Start Date/Time: 2026-03-18 12:00 UTC

    End Date/Time: 2026-03-18 17:00 UTC

    Backup Window:

    Start Date/Time: 2026-03-19 12:00 UTC

    End Date/Time: 2026-03-19 17:00 UTC

    Impact: Resilience will be lost, and services will be at risk of degradation. The following services may be impacted: ROPD SIGTRAN / Diameter LTE, ROPD IPX, ROPD Diameter P-GW, ROTN RADIUS, UKJ Gi Traffic, UKJ RADIUS / Diameter, and UKJ Signaling.

    Short description of work being done: Our partner will perform an upgrade to a Juniper device to ensure network stability and connectivity.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that this activity has been postponed. We will share the new dates with you once they are finalized.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: RESOLVED

  • ROTEU SIMs Connectivity 18032026 Planned Maintenance Notification - NEW-roteu sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 18. Please see the details below:

    Maintenance Window:

    Primary Window:

    Start Date/Time: 2026-03-18 12:00 UTC

    End Date/Time: 2026-03-18 17:00 UTC

    Backup Window:

    Start Date/Time: 2026-03-19 12:00 UTC

    End Date/Time: 2026-03-19 17:00 UTC

    Impact: Resilience will be lost, and services will be at risk of degradation. The following services may be impacted: ROPD SIGTRAN / Diameter LTE, ROPD IPX, ROPD Diameter P-GW, ROTN RADIUS, UKJ Gi Traffic, UKJ RADIUS / Diameter, and UKJ Signaling.

    Short description of work being done: Our partner will perform an upgrade to a Juniper device to ensure network stability and connectivity.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that this activity has been postponed. We will share the new dates with you once they are finalized.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: RESOLVED

  • ROTN SIMs Connectivity 18032026 Planned Maintenance Notification - NEW-rotn sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 18. Please see the details below:

    Maintenance Window:

    Primary Window:

    Start Date/Time: 2026-03-18 12:00 UTC

    End Date/Time: 2026-03-18 17:00 UTC

    Backup Window:

    Start Date/Time: 2026-03-19 12:00 UTC

    End Date/Time: 2026-03-19 17:00 UTC

    Impact: Resilience will be lost, and services will be at risk of degradation. The following services may be impacted: ROPD SIGTRAN / Diameter LTE, ROPD IPX, ROPD Diameter P-GW, ROTN RADIUS, UKJ Gi Traffic, UKJ RADIUS / Diameter, and UKJ Signaling.

    Short description of work being done: Our partner will perform an upgrade to a Juniper device to ensure network stability and connectivity.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that this activity has been postponed. We will share the new dates with you once they are finalized.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: RESOLVED

  • UKJ SIMs Connectivity 18032026 Planned Maintenance Notification - NEW-ukj sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 18. Please see the details below:

    Maintenance Window:

    Primary Window:

    Start Date/Time: 2026-03-18 12:00 UTC

    End Date/Time: 2026-03-18 17:00 UTC

    Backup Window:

    Start Date/Time: 2026-03-19 12:00 UTC

    End Date/Time: 2026-03-19 17:00 UTC

    Impact: Resilience will be lost, and services will be at risk of degradation. The following services may be impacted: ROPD SIGTRAN / Diameter LTE, ROPD IPX, ROPD Diameter P-GW, ROTN RADIUS, UKJ Gi Traffic, UKJ RADIUS / Diameter, and UKJ Signaling.

    Short description of work being done: Our partner will perform an upgrade to a Juniper device to ensure network stability and connectivity.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that this activity has been postponed. We will share the new dates with you once they are finalized.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: RESOLVED

  • ROPD SIMs Connectivity 18032026 Planned Maintenance Notification - NEW-ropd sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 18. Please see the details below:

    Maintenance Window:

    Primary Window:

    Start Date/Time: 2026-03-18 12:00 UTC

    End Date/Time: 2026-03-18 17:00 UTC

    Backup Window:

    Start Date/Time: 2026-03-19 12:00 UTC

    End Date/Time: 2026-03-19 17:00 UTC

    Impact: Resilience will be lost, and services will be at risk of degradation. The following services may be impacted: ROPD SIGTRAN / Diameter LTE, ROPD IPX, ROPD Diameter P-GW, ROTN RADIUS, UKJ Gi Traffic, UKJ RADIUS / Diameter, and UKJ Signaling.

    Short description of work being done: Our partner will perform an upgrade to a Juniper device to ensure network stability and connectivity.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that this activity has been postponed. We will share the new dates with you once they are finalized.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-18 12:00:00 UTC

    End time: 2026-03-18 17:00:00 UTC

    Duration: 0d 5h 0m

    Status: RESOLVED

  • NAUS SIMs Connectivity 15032026 Planned Maintenance Notification - NEW-naus sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: RESOLVED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: NEW

  • NAVZ SIMs Connectivity 15032026 Planned Maintenance Notification - NEW-navz sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: RESOLVED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: NEW

  • ROTAM SIMs Connectivity 15032026 Planned Maintenance Notification - NEW-rotam sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: RESOLVED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: NEW

  • NATM SIMs Connectivity 15032026 Planned Maintenance Notification - NEW-natm sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: RESOLVED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: NEW

  • UKAT SIMs Connectivity 15032026 Planned Maintenance Notification - NEW-ukat sims connectivity

    Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: RESOLVED

  • Description: Dear Customer,

    This is to inform you about maintenance taking place on March 15. Please see the details below:

    Maintenance Window

    Start Date/Time: 15-Mar-2026 05:01 (GMT) | 15-Mar-2026 00:01 (Central)

    End Date/Time: 15-Mar-2026 11:00 (GMT) | 15-Mar-2026 06:00 (Central)

    Impact: Resilience will be lost, and services will be at risk of degradation. US Cellular Diameter traffic will be impacted.

    Short description of work being done: Our transport partner’s service provider will perform maintenance to complete a mandatory fiber relocation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-15 05:01:00 UTC

    End time: 2026-03-15 11:00:00 UTC

    Duration: 0d 5h 59m

    Status: NEW

  • NAVZ SIMs Connectivity 24032026 Planned Maintenance - NEW (RESCHEDULED)-navz sims connectivity

    Description: Dear Customer,

    This is to inform you that the maintenance originally scheduled for February 25, to be carried out by one of our partners, has been rescheduled to March 24. During this time, preventative span maintenance will be performed to ensure network stability and connectivity. Please see the details below:

    New Maintenance Window

    Start Date/Time: 24-Mar-2026 07:01 GMT | 24-Mar-2026 00:01 Pacific Time

    End Date/Time: 24-Mar-2026 12:00 GMT | 24-Mar-2026 05:00 Pacific Time

    Impact: Resilience will be lost and services will be at risk of degradation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that the planned maintenance has been postponed. A new date has not yet been scheduled, and we will share the updated timeline with you as soon as it is confirmed.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: RESOLVED

  • UKAT SIMs Connectivity 24032026 Planned Maintenance - NEW (RESCHEDULED)-ukat sims connectivity

    Description: Dear Customer,

    This is to inform you that the maintenance originally scheduled for February 25, to be carried out by one of our partners, has been rescheduled to March 24. During this time, preventative span maintenance will be performed to ensure network stability and connectivity. Please see the details below:

    New Maintenance Window

    Start Date/Time: 24-Mar-2026 07:01 GMT | 24-Mar-2026 00:01 Pacific Time

    End Date/Time: 24-Mar-2026 12:00 GMT | 24-Mar-2026 05:00 Pacific Time

    Impact: Resilience will be lost and services will be at risk of degradation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that the planned maintenance has been postponed. A new date has not yet been scheduled, and we will share the updated timeline with you as soon as it is confirmed.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: RESOLVED

  • NAUS SIMs Connectivity 24032026 Planned Maintenance - NEW (RESCHEDULED)-naus sims connectivity

    Description: Dear Customer,

    This is to inform you that the maintenance originally scheduled for February 25, to be carried out by one of our partners, has been rescheduled to March 24. During this time, preventative span maintenance will be performed to ensure network stability and connectivity. Please see the details below:

    New Maintenance Window

    Start Date/Time: 24-Mar-2026 07:01 GMT | 24-Mar-2026 00:01 Pacific Time

    End Date/Time: 24-Mar-2026 12:00 GMT | 24-Mar-2026 05:00 Pacific Time

    Impact: Resilience will be lost and services will be at risk of degradation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that the planned maintenance has been postponed. A new date has not yet been scheduled, and we will share the updated timeline with you as soon as it is confirmed.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: RESOLVED

  • NATM SIMs Connectivity 24032026 Planned Maintenance - NEW (RESCHEDULED)-natm sims connectivity

    Description: Dear Customer,

    This is to inform you that the maintenance originally scheduled for February 25, to be carried out by one of our partners, has been rescheduled to March 24. During this time, preventative span maintenance will be performed to ensure network stability and connectivity. Please see the details below:

    New Maintenance Window

    Start Date/Time: 24-Mar-2026 07:01 GMT | 24-Mar-2026 00:01 Pacific Time

    End Date/Time: 24-Mar-2026 12:00 GMT | 24-Mar-2026 05:00 Pacific Time

    Impact: Resilience will be lost and services will be at risk of degradation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that the planned maintenance has been postponed. A new date has not yet been scheduled, and we will share the updated timeline with you as soon as it is confirmed.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: RESOLVED

  • ROTAM SIMs Connectivity 24032026 Planned Maintenance - NEW (RESCHEDULED)-rotam sims connectivity

    Description: Dear Customer,

    This is to inform you that the maintenance originally scheduled for February 25, to be carried out by one of our partners, has been rescheduled to March 24. During this time, preventative span maintenance will be performed to ensure network stability and connectivity. Please see the details below:

    New Maintenance Window

    Start Date/Time: 24-Mar-2026 07:01 GMT | 24-Mar-2026 00:01 Pacific Time

    End Date/Time: 24-Mar-2026 12:00 GMT | 24-Mar-2026 05:00 Pacific Time

    Impact: Resilience will be lost and services will be at risk of degradation.

    We apologize for any inconvenience this may cause and thank you for your understanding.

    Best regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: SCHEDULED

  • Description: Dear Customer,

    This is to notify you that the planned maintenance has been postponed. A new date has not yet been scheduled, and we will share the updated timeline with you as soon as it is confirmed.

    Thank you for your understanding.

    Regards,

    Services Affected: Data Services

    Location: GLOBAL

    Start time: 2026-03-24 07:01:00 UTC

    End time: 2026-03-24 12:00:00 UTC

    Duration: 0d 4h 59m

    Status: RESOLVED

  • Thursday 5th March 2026

    No incidents reported

    Wednesday 4th March 2026

    ROPD SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-ropd sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • ROPDT SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-ropdt sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • RONB SIMs connectivity 11032026 Planned Maintenance Notification - NEW-ronb sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • ROTN SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-rotn sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • ROTBS SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-rotbs sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • ROTGL SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-rotgl sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • ROTEU SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-roteu sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • UKJ SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-ukj sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • ROTAS SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-rotas sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW

  • ROPDB SIMs Connectivity 11032026 Planned Maintenance Notification - NEW-ropdb sims connectivity

    Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: SCHEDULED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: RESOLVED

  • Description: We would like to inform you of a planned maintenance activity scheduled for March 11 at one of our data centers in Europe. During this maintenance window, software updates will be performed as part of our ongoing efforts to maintain and improve service reliability. While no impact is expected for resilient services, there is a potential risk of temporary disruption to Internet connectivity.

    Services Affected: Data Services

    Location: EMEA

    Start time: 2026-03-11 20:00:00 UTC-00:00

    End time: 2026-03-11 23:00:00 UTC-00:00

    Duration: 0d 3h 0m

    Status: NEW